In summer 2022, a batch of industrial transformers from Turkey encountered typical electromechanical import three gates at Shanghai Baiyun International Airport: first, transformers as electromagnetic devices requiredCCC certification exemption certificate; Second, the copper content in the core components exceeded 80% and needed separate declaration forprecious metal components; most critically, the client mistakenly interpreted Refurbished on equipment nameplates as refurbished equipment, nearly triggeringused electromechanical product import ban.
Our team identified these three key risk points within 24 hours of accepting the order: By verifying theoriginal manufacturers statementissued by the Turkish Chamber of Commerce, we confirmed the equipment was actually new stock; coordinated with third-party testing agencies to issuematerial analysis reports; Most dramatically, within 72 hours before the goods arrived at port, we urgently assisted the client in submitting a Pre-shipment Inspection Certificate for Imported Used Electromechanical Products,correction applicationto customs, avoiding at least 15 days of return risk.
In this case, the declaration documents we prepared could serve as a textbook example:
Special reminder to peers: Since 2022, customs has added newenergy efficiency labelverification requirements forelectromagnetic equipment. The Turkish Ministry of Energys
documents we prepared happened to meet the equivalency recognition of Chinas GB 20052-2020 standard, this detail saved the client 3% tariff preference.
Link | Standard duration | III. The blitzkrieg of Shanghai airport clearance | Electronic declaration + advance appointment |
---|---|---|---|
Preparation before declaration | 2 working days | 4 Hours | This clearance set a speed record for our companys transformer products: |
Customs Document Review | 0.5 working day | Actual time taken | Pre-entry system + electronic document pre-review |
On-site inspection | 4 Hours | 1.5 hours | Booked machine inspection fast channel |
35 minutesAEO Advanced Certified EnterprisePrivilege: Completed document review before aircraft landing via pre-declaration + arrival confirmation mode; reduced unpacking inspection probability by 80% by pre-transmitting 3D scans via smart image review system.
privileges: Through the advance declaration + arrival confirmation mode, we completed document review before the plane landed; using the intelligent image review system to pre-transmit 3D scans of the equipment reduced the probability of physical inspection by 80%.
: Transformers with voltage stabilization function should be classified under 8504.40 rather than 8536.90: Istanbul exports must check for IPPC fumigation marks, absence will lead to entire batch detentionOur established58 hoursIndustry benchmark record.
With the RCEP agreement in effect, we have planned a more optimized path for transformer imports from Turkey:
Recently, we have been assisting clients in establishingImport compliance systems, including: Turkish technical document translation template libraries, key component HS code pre-classification databases, special requirement lists for major global ports, etc. As this case demonstrates, the value of professional agents lies not only inSolving problemsbut also inPreventing problems.